Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

Ключевые характеристики

Элемент Ссылка
Step 1 Confirm foundations and anchor positions
Step 2 Assemble in the factory sequence
Step 3 Electrical connection and earthing
Step 4 Function and load commissioning
Step 5 Operator and maintenance training
Сдавать Signed checklist and documentation set

Все цифры являются справочными и подтверждены техническим заданием вашего объекта.. Commissioning is the formal handover from installation to operation, and it ends with signed records. Видеть commissioning для фона.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Освещение, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – из park project to a single ride replacement – open on the date planned.


Варианты темы и отделки

Сделайте так, чтобы оно соответствовало вашему бренду: Installation model, supervision level and training scope.

Подобное оборудование производится, Проверено под нагрузкой и контейнер загружен на нашем 125,000 квадратный метр объекта того же производитель аттракционов, затем обеспечивается запасными частями и техническими консультациями в течение длительного времени после ввода в эксплуатацию. Проектная работа включает в себя компоновочные чертежи., поэтапные списки оборудования и документацию, которую вы можете передать непосредственно местному подрядчику.

Отправьте план участка, диапазон бюджета и целевая дата открытия – мы вернем поэтапное предложение, которое вы можете передать прямо своему совету директоров.