A carousel in central Europe has to survive frost, salt and months of low use, so the specification changes before it changes anywhere else.

This project in the Czech Republic shows what changes when the same ride is specified for a cold climate rather than a tropical one.

double decker carousel installation

ข้อมูลจำเพาะที่สำคัญ

รายการ อ้างอิง
ที่ตั้ง Czech Republic
ประเภทโครงการ ม้าหมุนสองชั้นสำหรับสวนสาธารณะ
ความจุ 48 ผู้ขับขี่ข้ามสองระดับ
ภูมิอากาศ Cold winters and wet springs
ออกแบบ Protected drive and weather resistant finishes
ส่งมอบ Commissioning records and spares

ตัวเลขทั้งหมดเป็นค่าอ้างอิงและได้รับการยืนยันในข้อเสนอทางวิศวกรรมสำหรับไซต์ของคุณ. Galvanised steel and coated fasteners are specified wherever moisture collects. See galvanised for background.

carousel figures and trim

Specifying for a Cold Climate

Cold climates demand different protection: low temperature lubricants in the drive, sealed and heated control cabinets, and finishes that resist freeze-thaw cycles. Drainage around the platform matters as much as the finish, because water that freezes under the base lifts concrete. Those specification changes are agreed at order stage, not discovered at commissioning.

แพลตฟอร์ม, Frame and Figures

The installation followed the standard four stage sequence – แพลตฟอร์มและคอลัมน์กลาง, กรอบหมุนและไดรฟ์, upper structure and stairs, แล้วตัวเลข, ตัดแต่งและแสงสว่าง. Figures and decorative parts were crated separately to protect painted surfaces, and the crew worked to the factory sequence so the upper floor was never loaded before the frame was aligned.

Winter Care and Annual Restart

A carousel in this climate has two operating seasons and one long inspection window. Before winter the drive is greased for low temperature, the canopy is checked for water traps and the platform is cleared of debris. At the start of the season the routine is a full electrical check, brake test and a slow rotation before guests board. ของเรา 48 ที่นั่งม้าหมุนขนาดใหญ่ platform follows the same maintenance logic for parks that want the capacity without the second deck.

What the Operator Learned

The lessons from this project apply anywhere: a carousel that runs in the evening needs lighting that can be serviced quickly, and a ride that closes for a season needs a storage plan for figures, lamps and trim. Both were written into the park’s own procedures during handover, along with a recommended spares list and the contact route for technical support.


สิ่งที่คุณสามารถปรับแต่งได้

การปรับแต่งครอบคลุมส่วนที่แขกสังเกตเห็นจริงๆ: สี, ตัวเลข, หลังคา, lighting programme and platform finish.

ที่ ผู้ผลิต ที่นี่คือโรงงานนั่นเอง: ออกแบบ, งานเหล็ก, การปั้น, การประกอบและการทดสอบทั้งหมดเกิดขึ้นภายใน 125,000 ฐานการผลิตตารางเมตร, และทุกหน่วยทำงานภายใต้ภาระก่อนที่จะบรรจุ. งานโครงการรวมถึงแบบร่าง, รายการอุปกรณ์และเอกสารแบบแบ่งเป็นระยะๆ คุณสามารถส่งตรงถึงผู้รับเหมาในพื้นที่ได้.

ให้รายละเอียดไซต์และกำหนดเวลาที่คุณกำลังทำงานให้เราทราบ – เราจะทำแผนที่เฟสต่างๆ, อุปกรณ์และโครงร่างต้นทุนเทียบกับมัน.