Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

ข้อมูลจำเพาะที่สำคัญ

รายการ อ้างอิง
Step 1 Confirm foundations and anchor positions
Step 2 Assemble in the factory sequence
Step 3 Electrical connection and earthing
Step 4 Function and load commissioning
Step 5 Operator and maintenance training
ส่งมอบ Signed checklist and documentation set

ตัวเลขทั้งหมดเป็นค่าอ้างอิงและได้รับการยืนยันในข้อเสนอทางวิศวกรรมสำหรับไซต์ของคุณ. Commissioning is the formal handover from installation to operation, and it ends with signed records. See commissioning for background.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. แสงสว่าง, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – จากก park project to a single ride replacement – open on the date planned.


ธีมและตัวเลือกการเสร็จสิ้น

ให้เข้ากับแบรนด์ของคุณ: Installation model, supervision level and training scope.

อุปกรณ์เช่นนี้ผลิตขึ้นมา, โหลดทดสอบและโหลดคอนเทนเนอร์ที่เรา 125,000 สิ่งอำนวยความสะดวกตารางเมตรเช่นเดียวกัน ผู้ผลิตขี่, จากนั้นจึงสนับสนุนด้วยอะไหล่และคำแนะนำด้านเทคนิคหลังจากการทดสอบเดินเครื่องเป็นเวลานาน. งานโครงการรวมถึงแบบร่าง, รายการอุปกรณ์และเอกสารแบบแบ่งเป็นระยะๆ คุณสามารถส่งตรงถึงผู้รับเหมาในพื้นที่ได้.

ส่งแผนพล็อตของคุณ, ช่วงงบประมาณและวันที่เปิดเป้าหมาย – เราจะส่งคืนข้อเสนอแบบเป็นขั้นตอนซึ่งคุณสามารถส่งตรงไปที่บอร์ดของคุณได้.