Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.
This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

主な仕様
| アイテム | 参照 |
|---|---|
| Step 1 | Confirm foundations and anchor positions |
| Step 2 | Assemble in the factory sequence |
| Step 3 | Electrical connection and earthing |
| Step 4 | Function and load commissioning |
| Step 5 | Operator and maintenance training |
| 引き渡す | Signed checklist and documentation set |
すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。. Commissioning is the formal handover from installation to operation, and it ends with signed records. See commissioning for background.

Foundations and Assembly
The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.
Electrical Connection and Earthing
Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.
Commissioning and Load Checks
Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. 点灯, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.
Training and Handover
Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – からの park project to a single ride replacement – open on the date planned.
テーマと仕上げのオプション
あなたのブランドに合わせてください: Installation model, supervision level and training scope.
このような装置が製造されています, 当社で負荷テストとコンテナの積み込みを行っています 125,000 同による平方メートル施設 乗り物メーカー, 試運転後もスペアパーツや技術的なアドバイスが提供されます. プロジェクト作業にはレイアウト図面が含まれます, 段階的な機器リストとドキュメントを地元の請負業者に直接渡すことができます.
プロットプランを送信してください, 予算範囲と目標開業日 – 段階的な提案を返信しますので、取締役会に直接提出してください。.










