Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.
This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

Wichtige Spezifikationen
| Artikel | Referenz |
|---|---|
| Schritt 1 | Bestätigen Sie Fundamente und Ankerpositionen |
| Schritt 2 | In der Werksreihenfolge zusammenbauen |
| Schritt 3 | Elektrischer Anschluss und Erdung |
| Schritt 4 | Funktions- und Lastinbetriebnahme |
| Schritt 5 | Bediener- und Wartungsschulung |
| Aushändigen | Signed checklist and documentation set |
Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt. Commissioning is the formal handover from installation to operation, and it ends with signed records. See commissioning for background.

Foundations and Assembly
The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.
Electrical Connection and Earthing
Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.
Commissioning and Load Checks
Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Beleuchtung, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.
Training and Handover
Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – von a park project to a single ride replacement – open on the date planned.
Themen- und Finish-Optionen
Passen Sie es an Ihre Marke an: Installation model, supervision level and training scope.
Solche Geräte werden hergestellt, Belastungsgeprüft und Container beladen bei uns 125,000 Quadratmeter-Anlage von der gleichen Hersteller von Fahrgeschäften, dann noch lange nach der Inbetriebnahme mit Ersatzteilen und technischer Beratung abgesichert. Die Projektarbeit umfasst Layoutzeichnungen, Gestaffelte Ausrüstungslisten und Dokumentationen, die Sie direkt an einen örtlichen Auftragnehmer weitergeben können.
Senden Sie Ihren Grundstücksplan, Budgetspanne und angestrebtes Eröffnungsdatum – Wir senden Ihnen einen schrittweisen Vorschlag zurück, den Sie direkt an Ihren Vorstand weiterleiten können.