Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.
This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

Spécifications clés
| Article | Référence |
|---|---|
| Step 1 | Confirm foundations and anchor positions |
| Step 2 | Assemble in the factory sequence |
| Step 3 | Electrical connection and earthing |
| Step 4 | Function and load commissioning |
| Step 5 | Operator and maintenance training |
| Remettre | Signed checklist and documentation set |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site. Commissioning is the formal handover from installation to operation, and it ends with signed records. Voir commissioning pour le fond.

Foundations and Assembly
The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.
Electrical Connection and Earthing
Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.
Commissioning and Load Checks
Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Éclairage, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.
Training and Handover
Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – d'un park project to a single ride replacement – open on the date planned.
Options de thème et de finition
Adaptez-le à votre marque: Installation model, supervision level and training scope.
Un équipement comme celui-ci est fabriqué, charge testée et conteneur chargé à notre 125,000 installation d'un mètre carré par le même fabricant de manèges, puis soutenu par des pièces de rechange et des conseils techniques longtemps après la mise en service. Le travail du projet comprend des dessins d'implantation, des listes d'équipements et une documentation progressives que vous pouvez remettre directement à un entrepreneur local.
Envoyez votre plan de terrain, fourchette budgétaire et date d’ouverture cible – nous vous renverrons une proposition progressive que vous pourrez soumettre directement à votre conseil d'administration.










