Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

Belangrijkste specificaties

Item Referentie
Step 1 Confirm foundations and anchor positions
Step 2 Assemble in the factory sequence
Step 3 Electrical connection and earthing
Step 4 Function and load commissioning
Step 5 Operator and maintenance training
Overdracht Signed checklist and documentation set

Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie. Commissioning is the formal handover from installation to operation, and it ends with signed records. Zien commissioning voor achtergrond.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Verlichting, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – van een park project to a single ride replacement – open on the date planned.


Thema- en afwerkingsopties

Zorg ervoor dat het bij uw merk past: Installation model, supervision level and training scope.

Dergelijke apparatuur wordt vervaardigd, belasting getest en container geladen bij ons 125,000 square metre facility by the same ride manufacturer, vervolgens ondersteund met reserveonderdelen en technisch advies, lang na de inbedrijfstelling. Projectwerkzaamheden omvatten lay-outtekeningen, gefaseerde uitrustingslijsten en documentatie die u rechtstreeks aan een plaatselijke aannemer kunt overhandigen.

Stuur uw plotplan, budgetbereik en beoogde openingsdatum – wij sturen u een gefaseerd voorstel terug waarmee u rechtstreeks naar uw bestuur kunt gaan.