In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.
This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

Основни спецификации
| Елемент | справка |
|---|---|
| държава | Lithuania |
| Тип проект | Double decker carousel |
| Contract value | EUR 156,276 class project |
| Климат | Cold winters, wet springs |
| Спецификация | Low temperature lubricants and sealed electricals |
| Операция | Seasonal with a prepared winter shutdown |
Всички цифри са референтни стойности и са потвърдени в инженерното предложение за вашия сайт. Galvanised steel and coated fasteners are specified for cold, wet conditions. Вижте Galvanization.

Cold Climate Specification
Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.
Assembly and Commissioning
The carousel was assembled in the standard sequence with the platform, рамка, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.
Evening Trade in a Short Season
Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.
Winter Shutdown and Spring Restart
Преди зимата задвижването се смазва за ниска температура, the canopy checked for water traps and the platform cleared. В началото на сезона рутината е пълна електрическа проверка, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.
Персонализиране и адаптиране на сайта
Вие решавате вида, поддържаме инженерния стандарт: Цветове, фигури, навес, lighting and winter specification.
Двадесет години производство и износ стоят зад този продукт, произведени в a 125,000 m² съоръжение с вът дизайн, инструментална екипировка и контрол на качеството. Работата по проекта включва чертежи на оформлението, поетапни списъци с оборудване и документация, които можете да предадете направо на местен изпълнител.
Дайте ни подробности за сайта и крайния срок, към който работите – ще картографираме фазите, оборудването и схемата на разходите спрямо него.