In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.

This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

carousel assembly on site

Especificaciones clave

Artículo Referencia
País Lithuania
Tipo de proyecto Double decker carousel
Contract value EUR 156,276 class project
Clima Cold winters, wet springs
Especificación Low temperature lubricants and sealed electricals
Operación Seasonal with a prepared winter shutdown

Todas las cifras son valores de referencia y están confirmados en la propuesta de ingeniería para su sitio.. Galvanised steel and coated fasteners are specified for cold, wet conditions. Ver Galvanization.

carousel lighting show

Cold Climate Specification

Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.

Assembly and Commissioning

The carousel was assembled in the standard sequence with the platform, marco, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.

Evening Trade in a Short Season

Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.

Winter Shutdown and Spring Restart

Antes del invierno la transmisión se engrasa para bajas temperaturas., the canopy checked for water traps and the platform cleared. Al inicio de temporada la rutina es una revisión eléctrica completa, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.


Personalización y ajuste del sitio

Tu decides el look, mantenemos el estándar de ingeniería: Bandera, cifras, pabellón, lighting and winter specification.

Veinte años de fabricación y exportación avalan este producto, producido en un 125,000 m² de instalaciones con interna diseño, herramientas y control de calidad. El trabajo del proyecto incluye dibujos de diseño., Listas de equipos por fases y documentación que puede entregar directamente a un contratista local..

Danos los detalles del sitio y la fecha límite para la que estás trabajando. – mapearemos las fases, El equipo y el esquema de costos..