In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.
This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

Spécifications clés
| Article | Référence |
|---|---|
| Pays | Lithuania |
| Type de projet | Double decker carousel |
| Contract value | EUR 156,276 class project |
| Climat | Cold winters, wet springs |
| Spécification | Low temperature lubricants and sealed electricals |
| Opération | Seasonal with a prepared winter shutdown |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site. Galvanised steel and coated fasteners are specified for cold, wet conditions. Voir Galvanization.

Cold Climate Specification
Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.
Assembly and Commissioning
The carousel was assembled in the standard sequence with the platform, cadre, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.
Evening Trade in a Short Season
Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.
Winter Shutdown and Spring Restart
Avant l'hiver, le variateur est graissé pour basse température, the canopy checked for water traps and the platform cleared. Au début de la saison, la routine est un contrôle électrique complet, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.
Personnalisation et ajustement du site
Vous décidez du look, nous gardons la norme d'ingénierie: Couleurs, chiffres, baldaquin, lighting and winter specification.
Vingt ans de fabrication et d'exportation sont derrière ce produit, produit dans un 125,000 m² d'installation avec en interne conception, outillage et contrôle qualité. Le travail du projet comprend des dessins d'implantation, des listes d'équipements et une documentation progressives que vous pouvez remettre directement à un entrepreneur local.
Donnez-nous les détails du chantier et la date limite à laquelle vous travaillez – nous cartographierons les phases, l'équipement et le coût indiqué par rapport à celui-ci.