In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.

This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

carousel assembly on site

Belangrijkste specificaties

Item Referentie
Land Lithuania
Projecttype Double decker carousel
Contractwaarde EUR 156,276 klasse project
Klimaat Cold winters, wet springs
Specificatie Low temperature lubricants and sealed electricals
Operatie Seasonal with a prepared winter shutdown

Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie. Galvanised steel and coated fasteners are specified for cold, wet conditions. Zien Galvanization.

carousel lighting show

Cold Climate Specification

Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.

Assembly and Commissioning

The carousel was assembled in the standard sequence with the platform, kader, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.

Evening Trade in a Short Season

Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.

Winter Shutdown and Spring Restart

Before winter the drive is greased for low temperature, the canopy checked for water traps and the platform cleared. At the start of the season the routine is a full electrical check, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.


Maatwerk en site-fit

Jij bepaalt de uitstraling, wij houden de technische standaard aan: Kleuren, cijfers, overkapping, lighting and winter specification.

Twintig jaar productie en export staan ​​achter dit product, geproduceerd in een 125,000 m² faciliteit met in-house ontwerp, gereedschap en kwaliteitscontrole. Projectwerkzaamheden omvatten lay-outtekeningen, gefaseerde uitrustingslijsten en documentatie die u rechtstreeks aan een plaatselijke aannemer kunt overhandigen.

Geef ons de locatiegegevens en de deadline waar u aan werkt – wij brengen de fases in kaart, de apparatuur en de kostenoverzicht daartegen.