In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.

This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

carousel assembly on site

Sleutel spesifikasies

Item Verwysing
Land Lithuania
Projek tipe Double decker carousel
Contract value EUR 156,276 class project
Klimaat Cold winters, wet springs
Specification Low temperature lubricants and sealed electricals
Operasie Seasonal with a prepared winter shutdown

Alle syfers is verwysingswaardes en word bevestig in die ingenieursvoorstel vir jou webwerf. Galvanised steel and coated fasteners are specified for cold, wet conditions. Sien Galvanization.

carousel lighting show

Cold Climate Specification

Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.

Assembly and Commissioning

The carousel was assembled in the standard sequence with the platform, frame, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.

Evening Trade in a Short Season

Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.

Winter Shutdown and Spring Restart

Voor die winter word die aandrywing gesmeer vir lae temperatuur, the canopy checked for water traps and the platform cleared. Aan die begin van die seisoen is die roetine 'n volledige elektriese ondersoek, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.


Pasmaak en werfpassing

Jy besluit die voorkoms, ons hou die ingenieursstandaard: Kleure, syfers, afdak, lighting and winter specification.

Twintig jaar se vervaardiging en uitvoer staan ​​agter hierdie produk, vervaardig in 'n 125,000 m² fasiliteit met in-huis ontwerp, gereedskap en kwaliteitbeheer. Projekwerk sluit uitlegtekeninge in, gefaseerde toerustinglyste en dokumentasie wat u direk aan 'n plaaslike kontrakteur kan oorhandig.

Gee vir ons die werfbesonderhede en die sperdatum waarna jy werk – ons sal die fases karteer, die toerusting en die koste uiteensetting daarteen.