In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.

This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

carousel assembly on site

주요 사양

목 참조
국가 Lithuania
프로젝트 유형 Double decker carousel
Contract value EUR 156,276 class project
기후 Cold winters, wet springs
사양 Low temperature lubricants and sealed electricals
작업 Seasonal with a prepared winter shutdown

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. Galvanised steel and coated fasteners are specified for cold, wet conditions. 보다 Galvanization.

carousel lighting show

Cold Climate Specification

Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.

Assembly and Commissioning

The carousel was assembled in the standard sequence with the platform, 액자, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.

Evening Trade in a Short Season

Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.

Winter Shutdown and Spring Restart

겨울이 오기 전에 드라이브에 저온 유지를 위해 윤활유를 바릅니다., the canopy checked for water traps and the platform cleared. 시즌이 시작되면 루틴은 전체 전기 점검입니다., brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.


맞춤화 및 사이트 맞춤

외모는 네가 결정해, 우리는 엔지니어링 표준을 유지합니다: 그림 물감, 피규어, 천개, lighting and winter specification.

20년 간의 제조 및 수출 경험이 이 제품을 뒷받침합니다., 에서 생산 125,000 m² 시설을 자체적으로 보유 설계, 툴링 및 품질 관리. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.

작업 중인 사이트 세부 정보와 마감일을 알려주십시오. – 우리는 단계를 매핑할 것입니다, 장비 및 이에 대한 비용 개요.