In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.
This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

Especificações principais
| Item | Referência |
|---|---|
| País | Lithuania |
| Tipo de projeto | Double decker carousel |
| Contract value | EUR 156,276 class project |
| Clima | Cold winters, wet springs |
| Especificação | Low temperature lubricants and sealed electricals |
| Operação | Seasonal with a prepared winter shutdown |
Todos os valores são valores de referência e estão confirmados na proposta de engenharia da sua obra. Galvanised steel and coated fasteners are specified for cold, wet conditions. Ver Galvanization.

Cold Climate Specification
Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.
Assembly and Commissioning
The carousel was assembled in the standard sequence with the platform, quadro, dirigir, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.
Evening Trade in a Short Season
Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.
Winter Shutdown and Spring Restart
Before winter the drive is greased for low temperature, the canopy checked for water traps and the platform cleared. At the start of the season the routine is a full electrical check, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.
Personalização e ajuste ao site
Você decide o visual, mantemos o padrão de engenharia: Cores, figuras, dossel, lighting and winter specification.
Vinte anos de fabricação e exportação estão por trás deste produto, produzido em um 125,000 instalação de m² com instalação interna projeto, ferramentas e controle de qualidade. O trabalho do projeto inclui desenhos de layout, listas de equipamentos e documentação em fases que você pode entregar diretamente a um empreiteiro local.
Forneça-nos os detalhes do site e o prazo que você está trabalhando – vamos mapear as fases, o equipamento e o esboço de custo contra ele.










