In northern Europe a carousel needs a winter plan as much as a summer one, and that plan is written before the machine is ordered.

This project installed a two storey carousel with a specification prepared for cold, wet conditions and a documented shutdown and restart procedure.

carousel assembly on site

Specifiche chiave

Articolo Riferimento
Paese Lithuania
Tipo di progetto Double decker carousel
Contract value EUR 156,276 class project
Clima Cold winters, wet springs
Specification Low temperature lubricants and sealed electricals
Operazione Seasonal with a prepared winter shutdown

Tutti i valori sono valori di riferimento e sono confermati nella proposta ingegneristica per il vostro sito. Galvanised steel and coated fasteners are specified for cold, wet conditions. Vedere Galvanization.

carousel lighting show

Cold Climate Specification

Drive lubricants, control cabinets and finishes were specified for low temperatures, and drainage around the platform was designed so water cannot freeze under the base. Those details cost little at order stage and prevent the corrosion and cracking that come from freeze-thaw cycles.

Assembly and Commissioning

The carousel was assembled in the standard sequence with the platform, telaio, drive, upper structure and figures installed in order, followed by commissioning and restraint checks. Because parts were loaded in assembly sequence, the crew never reopened a crate.

Evening Trade in a Short Season

Lighting and music were designed as a show, and the ride trades into the evening during the operating season when the park is at its busiest. The lighting also becomes the attraction on short winter days, when guests arrive in the dark.

Winter Shutdown and Spring Restart

Prima dell'inverno l'azionamento viene lubrificato per le basse temperature, the canopy checked for water traps and the platform cleared. All'inizio della stagione la routine prevede un controllo elettrico completo, brake test and slow rotation before guests board – the same disciplined approach we recommend for any double decker carousel.


Personalizzazione e adattamento al sito

Sei tu a decidere il look, manteniamo lo standard di ingegneria: Colori, figure, baldacchino, lighting and winter specification.

Vent'anni di produzione ed esportazione stanno dietro questo prodotto, prodotto nell'a 125,000 struttura di m² con ingresso interno progetto, attrezzature e controllo qualità. Il lavoro del progetto include disegni di layout, elenchi e documentazione graduali delle attrezzature che puoi consegnare direttamente a un appaltatore locale.

Forniscici i dettagli del sito e la scadenza entro la quale stai lavorando – mapperemo le fasi, l'attrezzatura e il relativo costo.