Equipment rarely arrives damaged because of the sea voyage – it arrives damaged because of how it was packed and how the container was loaded.

This is how we pack a shipment so that the crew on site opens crates in the order they need them, and finds everything where the drawings say it is.

container loading plan

Wichtige Spezifikationen

Artikel Referenz
Kiste Durch Unterbaugruppe, anhand der Zeichnungen nummeriert
Schutz Stahl behandelt, Formteile getrennt, Platten versiegelt
Laden In Einbaureihenfolge verpackt
Dokumentation Den Zeichnungen entsprechende Packliste
Inspektion Fotos vor Türschluss
Result Fewer site delays and less damage

Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt. Rides travel by containerization, so packing and loading plans follow international shipping practice.

ride crating and protection

Crating by Sub Assembly

Parts are crated by sub assembly rather than by size, and each crate is numbered against the installation drawings. That means the crew on site opens one crate per stage instead of searching through a container. Moulded parts, electrical panels and instruments travel separately with foam protection and sealed packaging.

Protection for the Voyage

Structural steel is treated for a sea crossing, machined surfaces are greased and wrapped, and painted items are separated so they cannot rub in transit. Electrical cabinets travel with desiccant and are sealed against humidity, because moisture damage inside a control panel is expensive and invisible until commissioning.

Loading in Installation Sequence

The loading plan is the reverse of the installation sequence: parts needed first sit nearest the doors. Heavy sections are secured with timber and strapping to prevent movement, and load distribution keeps the container within limits. A copy of the loading plan travels with the shipment and is shared with the client in advance.

Documentation and Pre Departure Inspection

Before the doors close we photograph the loaded container, verify the packing list against the drawings, and send the file to the client with the shipping documents. That single step settles most questions about shortages before the vessel sails, and it is standard practice on every project, von a 46m Riesenrad down to a package of kiddie rides.


Was Sie individuell anpassen können

Die folgenden Angaben sind auf Ihren Park abgestimmt: Packing method, marking and loading plan.

Solche Geräte werden hergestellt, Belastungsgeprüft und Container beladen bei uns 125,000 sqm facility by the same Hersteller von Fahrgeschäften, dann noch lange nach der Inbetriebnahme mit Ersatzteilen und technischer Beratung abgesichert. Familienfahrten Schiff mit Rückhaltevorschriften, Zyklusprofile und Kapazitätszahlen für jede Konfiguration.

Senden Sie Ihren Parkplan und die Altersgruppen, die Sie bedienen möchten – Wir werden ein Layout mit Kapazität zurückgeben, Strombedarf und Preisgestaltung.