A slide world is not a slide. It is a small landscape of lanes, towers and landings that guests walk through for an hour, and it earns because the queue keeps moving.

Clients in Indonesia ask for a slide world by name, but the projects that work are the ones where the lane count, the run out and the shading were planned before the first container was loaded.

rainbow slide complex

Wichtige Spezifikationen

Artikel Referenz
Signature element Rainbow slide complex with multiple lanes
Support attractions Climbing towers, swing structures, sand play
Site need Slope or engineered platform for height
Throughput driver Number of lanes, not length of slide
Phaseneinteilung Add lanes and towers in stages
Sicherheit Run out length, landing surfaces and supervision

Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt.

slide world lanes

What Makes a Slide World

The core is a multi lane slide complex with several chute profiles – straight, Welle und Spirale – built on a tower or a slope, usually finished in bright rainbow colours that make the structure visible from a distance. Around it sit the supporting attractions: climbing towers, a swing structure, sand play and a small water element for hot days. Together they hold families for a full half day.

Lane Count and Throughput

Every extra lane adds capacity at a fraction of the cost of a second tower, so the economics of a slide world favour wide structures over tall ones. Calculate realistic throughput per lane including the climb time of each guest, and design the tower stairs so climbing guests never meet sliding guests. A wider complex with generous landings usually beats a taller one in daily revenue. Operators who want to see the structure itself can compare it with our Spielplatz mit Regenbogenrutsche range before the first drawing is issued.

Phasing a Slide World Project

Phase one should deliver the tower, two or three lanes, the landing zone, the access path and shade. Phase two adds lanes and the supporting play structures, and phase three adds water play or a themed entrance. Because the platform and tower are designed for expansion from the start, later phases cost far less than a second stand alone attraction.

Auslaufen, Landing and Daily Inspection

Run out length, landing surface and the exit route are safety decisions that also decide how fast guests turn around. Check chute joints, side wall fixings and handrails daily, inspect the tower bolts and netting weekly, and confirm the landing surface has not compacted. Chutes are moulded from glasfaserverstärkter Kunststoff, so gel coat damage should be repaired before water reaches the laminate.


Themen- und Finish-Optionen

Optionen, die Sie vor Produktionsbeginn festlegen können: Spuranzahl, chute profiles, tower height, colour scheme and supporting attractions.

Wir bauen Attraktionen, anstatt sie weiterzuverkaufen, Deshalb kommen technische Fragen als Zeichnungen und nicht als Broschüren zurück – und warum a 125,000 m² Produktionsbasis können Anpassungen vornehmen, ohne Ihren Liefertermin zu verschieben. Nicht angetriebene Strukturen werden mit Fallhöhendaten und Oberflächenempfehlungen für jede Plattform und jeden Rutschenausgang geliefert.

Teilen Sie uns das Geländelayout mit und wir erstellen einen Zonenplan mit den Strukturen, Auftauchen, Entwässerung und die Reihenfolge, in der sie eingebaut werden.