Groups rarely build everything at once. This project was a second phase, adding a non-powered zone to a destination that already traded successfully.

Because the first phase was already operating, the new zone had to fit around existing walkways, power and ticket systems rather than start from a blank plot.

multi lane slide complex

Pangunang Detalye

butang Reperensya
Nasud Malaysia
Matang sa proyekto Non-powered park phase two
Contract value USD 64,300 class project
Client type Leisure group operator
Kasangkaran Equipment supply with installation guidance
Focus Adding capacity to an existing attraction

Ang tanan nga mga numero mga reference value ug gikumpirma sa engineering proposal para sa imong site. Both parks build to established playground safety practice. Tan-awa Playground.

climbing structure for park

Designing Around an Operating Site

The layout was planned against the existing entrance, queue lines and service routes so the new play zone could be built without closing the rest of the destination. Deliveries were scheduled outside peak hours, and the installation area was fenced small enough that guests barely noticed the work.

Choosing Equipment for Added Capacity

Phase two concentrated on capacity rather than novelty: a slide complex with multiple lanes, climbing structures and a large swing installation. That combination raises the number of children the site can hold at once without increasing staff in proportion, because the equipment is self directed.

Integration With the Existing Operation

Ticket and wristband systems already existed, so the new zone was simply added to the same entry model. Staff were trained on the additional inspection routine, and the surfacing plan was recorded alongside the original park drawings so future maintenance stays in one document.

What Phase Two Delivered

Adding the zone lengthened visits and lifted weekend revenue without new head office staff or new utilities. Operators planning a similar expansion usually start from the layouts we describe for non-powered parks and phase in the same order: anchor structure, then supporting play, then shade and service points.


Mga Opsyon sa Disenyo

Ang pag-customize naglangkob sa mga bahin nga namatikdan sa mga bisita: Layout, mix, colours and phasing.

Baynte ka tuig nga paggama ug pag-eksport nagbarug sa luyo niini nga produkto, gihimo sa a 125,000 square meter nga pasilidad nga adunay in-house disenyo, tooling ug pagkontrol sa kalidad. Ang mga non-powered nga istruktura nagpadala nga adunay datos sa gitas-on sa pagkahulog ug mga rekomendasyon sa pag-surf sa matag plataporma ug paggawas sa slide.

Ipadala ang imong plano sa laraw ug gusto sa pag-surf – ibalik namon ang usa ka layout nga adunay taas nga pagkahulog, estratehiya sa shade ug usa ka lista sa mga ekipo nga phased.