Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

Pangunang Detalye

butang Reperensya
Step 1 Confirm foundations and anchor positions
Step 2 Assemble in the factory sequence
Step 3 Electrical connection and earthing
Step 4 Function and load commissioning
Step 5 Operator and maintenance training
Pagtugyan Signed checklist and documentation set

Ang tanan nga mga numero mga reference value ug gikumpirma sa engineering proposal para sa imong site. Commissioning is the formal handover from installation to operation, and it ends with signed records. Tan-awa commissioning para sa background.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Pagsiga, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – gikan sa a park project to a single ride replacement – open on the date planned.


Mga Opsyon sa Tema ug Paghuman

Himoa kini nga mohaum sa imong brand: Installation model, supervision level and training scope.

Ang mga kagamitan nga sama niini gihimo, load gisulayan ug sudlanan load sa atong 125,000 metro kwadrado nga pasilidad pinaagi sa parehas tiggama sa sakyanan, unya gipaluyohan sa mga spare parts ug teknikal nga tambag dugay na human sa commissioning. Ang trabaho sa proyekto naglakip sa mga drowing sa layout, mga lista sa mga ekipo ug mga dokumentasyon nga mahimo nimong ihatag diretso sa lokal nga kontraktor.

Ipadala ang imong plano sa laraw, budget range ug target opening date – ibalik namo ang usa ka phased proposal nga imong madala diretso sa imong board.