Installation is a sequence, not a task. Follow it and the machine is running on schedule; skip a step and the delay appears later, usually on opening day.

This is the on site routine we run with local crews, from the first foundation survey to the handover checklist.

ride assembly on site

Ključne specifikacije

Artikal Referenca
Step 1 Confirm foundations and anchor positions
Step 2 Assemble in the factory sequence
Step 3 Electrical connection and earthing
Step 4 Function and load commissioning
Step 5 Operator and maintenance training
Primopredaja Signed checklist and documentation set

Sve brojke su referentne vrijednosti i potvrđene su u inženjerskom prijedlogu za vaše mjesto. Commissioning is the formal handover from installation to operation, and it ends with signed records. Vidjeti commissioning za pozadinu.

ride commissioning checks

Foundations and Assembly

The first job on site is not assembly, it is verification: foundations surveyed, anchor bolts checked against the drawing, and the base line confirmed. Assembly then follows the factory sequence, with torque values recorded and photographs taken at each stage so the factory can confirm progress remotely. Local labour usually carries out the work under a factory technician’s supervision.

Electrical Connection and Earthing

Electrical work follows the schematic supplied with the machine: supply, distribution, earthing and control wiring. Earthing is not optional in a tropical site with high rainfall, and every terminal is checked before power is applied for the first time. Cable routing is planned so that it can be inspected later without dismantling the ride.

Commissioning and Load Checks

Commissioning covers start and stop sequences, emergency stops, restraint locking, brake performance, travel limits and a full operating cycle. Where the design requires load testing, it is carried out and recorded before guests board. Rasvjeta, sound and any show programme are commissioned at the same time so the ride opens complete rather than finished later.

Training and Handover

Training happens on the machine: operators on start-up, loading, restraint checks and evacuation, and maintenance staff on the inspection routine, lubrication and wear parts. Handover ends with a signed checklist plus manuals, drawings, schematics and test records. Projects that follow this path – od a park project to a single ride replacement – open on the date planned.


Opcije teme i završetka

Neka odgovara vašem brendu: Installation model, supervision level and training scope.

Ovakva oprema se proizvodi, testirano opterećenje i kontejner utovaren kod nas 125,000 četvornih metara objekta po istom proizvođač vožnje, zatim podržan rezervnim dijelovima i tehničkim savjetima dugo nakon puštanja u pogon. Rad na projektu uključuje nacrte izgleda, fazni popis opreme i dokumentacija koju možete predati izravno lokalnom izvođaču.

Pošaljite svoj plan parcele, proračunski raspon i ciljani datum otvaranja – vratit ćemo fazni prijedlog koji možete odnijeti ravno svojoj ploči.