School holidays and the major festive periods deliver the attendance that carries a park for the rest of the year, and they are planned months ahead.
A festive season is a product, not a decoration: the rides, the ticket, the staffing and the photo opportunities all have to be designed together.

Key Specifications
| Item | Reference |
|---|---|
| Seasons | New Year, Eid holiday period, school breaks |
| Attractions | Themed rides, photo points, stage area |
| Setup | Days of assembly with storage between seasons |
| Lighting | Festive LED and music programs |
| Ticketing | Event entry, bundles and group rates |
| Staffing | Peak rotas with supervision ratios |
All figures are reference values and are confirmed in the engineering proposal for your site.

Why Festive Seasons Decide the Year
In Indonesia attendance concentrates around school holidays, the New Year period and the Eid al-Fitr holiday week, when families travel and spend on leisure. A park that plans for those weeks can earn a large share of its annual revenue in a short period – but only if capacity, staffing and ticketing are prepared for the volume.
Theming Without Rebuilding
You do not need new machines for a festive season. Existing rides can be dressed with light sets, canopies and temporary decoration, while one or two themed attractions – a Christmas or holiday themed ride such as our christmas theme ride package – become the photograph that markets the event. The rule is to concentrate decoration where guests already gather: the entrance, the main plaza and the ride with the longest queue.
Ticketing and Bundling for Events
Event periods support different ticketing: entry plus a bundle of rides, family packages, group rates for extended families and photo packages. Keep the offer simple enough to explain in one line at the gate, and make sure the price ladder rewards guests who stay longer. Because festive visitors are often first time guests, entry experience and signage matter more than loyalty offers during these weeks.
Staffing, Safety and Storage Between Seasons
Peak seasons multiply both attendance and risk, so rosters should be built from realistic supervision ratios rather than last year’s numbers. Brief temporary staff on ride rules and emergency procedures before they work a gate, and keep a supervisor free of a station so someone can respond without closing an attraction. Between seasons, clean decorations, store lighting and signage in labelled crates with the assembly drawings, and the next event will take days rather than weeks to build.
What You Can Tailor
The following details are matched to your park: Event concepts, theming, temporary attractions, lighting programs and ticketing.
The manufacturer here is the factory itself: design, steelwork, moulding, assembly and testing all happen inside a 125,000 square metre production base, and every unit is run under load before it is packed. Project work includes layout drawings, phased equipment lists and documentation you can hand straight to a local contractor.
Send your plot plan, budget range and target opening date – we will return a phased proposal you can take straight to your board.










