A slide world is not a slide. It is a small landscape of lanes, towers and landings that guests walk through for an hour, and it earns because the queue keeps moving.

Clients in Indonesia ask for a slide world by name, but the projects that work are the ones where the lane count, the run out and the shading were planned before the first container was loaded.

rainbow slide complex

Spécifications clés

Article Référence
Signature element Rainbow slide complex with multiple lanes
Support attractions Climbing towers, swing structures, sand play
Site need Slope or engineered platform for height
Throughput driver Number of lanes, not length of slide
Phaser Add lanes and towers in stages
Sécurité Run out length, landing surfaces and supervision

Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

slide world lanes

What Makes a Slide World

The core is a multi lane slide complex with several chute profiles – straight, vague et spirale – built on a tower or a slope, usually finished in bright rainbow colours that make the structure visible from a distance. Around it sit the supporting attractions: climbing towers, a swing structure, sand play and a small water element for hot days. Together they hold families for a full half day.

Lane Count and Throughput

Every extra lane adds capacity at a fraction of the cost of a second tower, so the economics of a slide world favour wide structures over tall ones. Calculate realistic throughput per lane including the climb time of each guest, and design the tower stairs so climbing guests never meet sliding guests. A wider complex with generous landings usually beats a taller one in daily revenue. Operators who want to see the structure itself can compare it with our Aire de jeux toboggan arc-en-ciel range before the first drawing is issued.

Phasing a Slide World Project

Phase one should deliver the tower, two or three lanes, the landing zone, the access path and shade. Phase two adds lanes and the supporting play structures, and phase three adds water play or a themed entrance. Because the platform and tower are designed for expansion from the start, later phases cost far less than a second stand alone attraction.

S'épuiser, Landing and Daily Inspection

Run out length, landing surface and the exit route are safety decisions that also decide how fast guests turn around. Check chute joints, side wall fixings and handrails daily, inspect the tower bolts and netting weekly, and confirm the landing surface has not compacted. Chutes are moulded from plastique renforcé de verre, so gel coat damage should be repaired before water reaches the laminate.


Options de thème et de finition

Options que vous pouvez spécifier avant le début de la production: Nombre de voies, chute profiles, tower height, colour scheme and supporting attractions.

Nous construisons des attractions plutôt que de les revendre, c'est pourquoi les questions techniques reviennent sous forme de dessins plutôt que de brochures – et pourquoi un 125,000 m² base de production peut absorber la personnalisation sans déplacer votre date de livraison. Les structures non motorisées sont livrées avec des données sur la hauteur de chute et des recommandations de revêtement pour chaque plate-forme et sortie de toboggan..

Partagez la disposition du site et nous produirons un plan de zone montrant les structures, surfaçage, drainage et la séquence pour les construire.