This order solved two problems at once: moving guests around a large site all year, and creating a festive attraction for the holiday season.

The park took a 72 seat diesel tourist train for daily transport duty and a Christmas tree ride as the centrepiece of its seasonal event.

tourist train route

주요 사양

목 참조
국가 Venezuela
프로젝트 유형 Tourist train plus seasonal ride
Contract value USD 172,680 class project
제품 72 seat diesel train, 크리스마스 트리 타기
범위 장비, 배송 및 설치 지원
작업 Year round transport plus seasonal event

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. The train runs on diesel power, chosen for a long outdoor route and simple refuelling. 보다 Diesel engine.

christmas tree ride

The Train as Transport and Attraction

A tourist train earns twice: it carries guests between zones, reducing walking fatigue, and it is itself a family ride with children queuing for the front carriage. The route was planned with stations at the entrance, the middle of the site and the far end, with boarding kept clear of the main walkway.

The Seasonal Centrepiece

The Christmas tree ride was specified with a full lighting and music package so the park could sell an evening event as well as daytime visits. Seasonal attractions raise revenue per guest because visitors come specifically for the atmosphere, and photographs do free marketing.

Shipping and Installation

Both units shipped together, which meant one installation programme and one crew on site. The train route was prepared while the ride foundations were poured, and both were commissioned before the holiday season began.

Operating Rhythm Across the Year

The train runs daily with a scheduled service, while the seasonal ride becomes the focus for a defined period and is maintained in between. Operators planning a similar combination often start from our trackless tourist train range and add themed attractions for each season.


맞춤화 및 사이트 맞춤

외모는 네가 결정해, 우리는 엔지니어링 표준을 유지합니다: 노선, 캐리지 디자인, ride theme and lighting.

같은 오락 장비 공장 라이드를 만드는 사람은 배송도 해준다., 이를 문서화하고 지원합니다. – 125,000 평방미터의 생산 공간과 현지 검사관이 사용할 수 있는 문서 패키지. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.

작업 중인 사이트 세부 정보와 마감일을 알려주십시오. – 우리는 단계를 매핑할 것입니다, 장비 및 이에 대한 비용 개요.