A written procedure that has never been practised is not an emergency plan – it is a document. The difference shows in the first two minutes of a real incident.

This is the emergency framework we recommend for family parks and indoor venues, built around drills that staff actually run rather than manuals nobody reads.

park safety drill training

Belangrijkste specificaties

Item Referentie
Core scenarios Ride stoppage, evacuation, fire, medical, severe weather
Roles Every staff member has a named role
Apparatuur Stop controls, first aid, communication
Drills Rehearsed at least once per season
Records Signed drill log and incident reports
Review Findings feed back into training

Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie. Every park needs a practised emergency evacuation plan, not a document that has never been tested.

staff safety briefing

The Scenarios Worth Planning For

Five situations cover most park emergencies: a ride stopping with guests on board, an evacuation of a zone or the whole site, fire or smoke, a medical incident involving a guest, and severe weather such as a storm or high wind. For each one, the plan should say who takes control, who speaks to guests, who calls emergency services and who handles the rest of the park while the incident is being managed.

Roles, Communication and Equipment

Every member of staff needs a named role in at least one scenario, and the roles should be printed where staff actually work, not filed in an office. Communication is usually the weakest link: agree one channel and one fallback, keep stop controls and first aid kits in known positions, and make sure the person on the gate knows how to stop guests entering an affected zone.

Drills That Prove the Plan

Run at least one drill per season, alternating scenarios so the team does not rehearse the same one and assume the rest will work. Time the response, note where people hesitated, and close the park down or use a quiet period so the drill is realistic. New staff should run a drill within their first weeks rather than shadowing someone for a month first.

Records, Incidents and Continuous Review

Keep a signed drill log, a first aid register and an incident report template, because those three documents answer almost every question an insurer or inspector will ask. Review every real incident within a week, including near misses, and change the procedure if the review shows a gap. Parks running several attractions, van een new park project to an established site, follow the same loop: plan, drill, record, improve.


Thema- en afwerkingsopties

Locatiespecifieke keuzes omvatten: Emergency plans, drill templates and record formats.

Wij bouwen attracties in plaats van ze door te verkopen, Daarom komen technische vragen terug als tekeningen in plaats van als brochures – en waarom een 125,000 m² productie basis kan maatwerk opvangen zonder uw leverdatum te verschuiven. Familieritten worden geleverd met beveiligingsspecificaties, cyclusprofielen en capaciteitscijfers voor elke configuratie.

Stuur uw parkplan en de leeftijdsgroepen die u wilt bedienen – wij sturen u een indeling met capaciteit terug, stroombehoefte en prijs.