Groups rarely build everything at once. This project was a second phase, adding a non-powered zone to a destination that already traded successfully.
Because the first phase was already operating, the new zone had to fit around existing walkways, power and ticket systems rather than start from a blank plot.

Belangrijkste specificaties
| Item | Referentie |
|---|---|
| Land | Maleisië |
| Projecttype | Niet-aangedreven parkfase twee |
| Contractwaarde | USD 64,300 klasse project |
| Type klant | Exploitant van vrijetijdsgroepen |
| Domein | Levering van apparatuur met installatiebegeleiding |
| Focus | Adding capacity to an existing attraction |
Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie. Both parks build to established playground safety practice. Zien Playground.

Designing Around an Operating Site
The layout was planned against the existing entrance, queue lines and service routes so the new play zone could be built without closing the rest of the destination. Deliveries were scheduled outside peak hours, and the installation area was fenced small enough that guests barely noticed the work.
Choosing Equipment for Added Capacity
Phase two concentrated on capacity rather than novelty: a slide complex with multiple lanes, climbing structures and a large swing installation. That combination raises the number of children the site can hold at once without increasing staff in proportion, because the equipment is self directed.
Integration With the Existing Operation
Ticket and wristband systems already existed, so the new zone was simply added to the same entry model. Staff were trained on the additional inspection routine, and the surfacing plan was recorded alongside the original park drawings so future maintenance stays in one document.
What Phase Two Delivered
Adding the zone lengthened visits and lifted weekend revenue without new head office staff or new utilities. Operators planning a similar expansion usually start from the layouts we describe for non-powered parks and phase in the same order: anchor structure, then supporting play, then shade and service points.
Ontwerpopties
Maatwerk omvat de onderdelen die gasten daadwerkelijk opmerken: Indeling, mix, colours and phasing.
Twintig jaar productie en export staan achter dit product, geproduceerd in een 125,000 vierkante meter faciliteit met in-house ontwerp, gereedschap en kwaliteitscontrole. Niet-aangedreven constructies worden geleverd met valhoogtegegevens en aanbevelingen voor de oppervlakte voor elk platform en elke glijbaanuitgang.
Stuur uw kavelplan en ondergrondvoorkeur mee – wij retourneren een indeling met valhoogtes, schaduwstrategie en een gefaseerde uitrustingslijst.