This was one of our larger non-powered projects in Southeast Asia, and the design brief was simple: keep families on site for three hours without a single motor.
The park combined a slide complex with climbing and swing structures, arranged so guests move through the site rather than queue at one attraction.

Belangrijkste specificaties
| Item | Referentie |
|---|---|
| Land | Maleisië |
| Projecttype | Familiepark zonder elektriciteit |
| Contractwaarde | USD 125,900 klasse project |
| Domein | Levering van apparatuur, verzend- en installatiebegeleiding |
| Mengen | Glijcomplex, klimmen, schommel en familiespel |
| Steun | Layout design, surfacing notes and staff training |
Alle cijfers zijn referentiewaarden en worden bevestigd in het technische voorstel voor uw locatie.

Zoning a Large Play Area
The plot was divided into a main play zone, a toddler area and a shaded family zone with seating and service points. The slide complex sat where it is visible from the entrance, while older childrens climbing equipment was placed furthest from the toddler area to keep supervision simple and reduce collisions.
Equipment Selected for Tropical Use
Structures were specified for heat, vochtigheid en hevige regen: protected steel frames, UV stable finishes and netting that keeps its strength when wet. Impact surfacing was chosen to drain rather than hold water, and fall heights were recorded on the layout so the park can check depths on a schedule.
Installation and Handover
The equipment shipped in phases so the park could open its main zone first and complete the secondary areas afterwards. Installation ran under factory supervision with local labour, followed by commissioning checks and staff training on daily inspection, supervision positions and capacity control.
Running a Non-Powered Park Profitably
Without machines, the operating cost is staffing, cleaning and surfacing maintenance – which is why the park carries a small team and keeps entry pricing simple. The same logic is described in our guide to a non powered amusement park, and the safety approach follows recognised playground practice such as IN 1176.
Gemaakt om bij uw park te passen
Al het zichtbare is aan jou om te definiëren: Zone layout, equipment mix, surfacing and shade.
Elke eenheid laat een 125,000 m² fabriek in China met testrecords, tekeningen en een lijst met aanbevolen reserveonderdelen, dat is wat een productiepartner moet overhandigen in plaats van simpelweg te factureren. Niet-aangedreven constructies worden geleverd met valhoogtegegevens en aanbevelingen voor de oppervlakte voor elk platform en elke glijbaanuitgang.
Deel de terreinindeling en wij maken een zoneplan met de bebouwing, opduiken, drainage en de volgorde waarin ze worden ingebouwd.