Water is the strongest seasonal product a tropical park can own, and it is also the one most often designed backwards – equipment first, plant room last.
This is how a turnkey water project is put together so that the water stays clean, the lifeguards can see everything and the park can open in phases.

主な仕様
| アイテム | 参照 |
|---|---|
| 範囲 | デザイン, 装置, 設置サポート |
| Water products | Slide complex, splash zone, frame pool, challenge course |
| Site needs | Water supply, drainage and a plant room |
| 水処理 | 濾過, circulation and dosing |
| 運営 | Lifeguards, session rules, testing log |
| フェージング | Start with one water zone and expand |
すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。.

What a Turnkey Water Solution Includes
A complete solution covers the layout of the water zones, the equipment list with drawings, the water treatment and circulation design, installation support and the operating documents – rules, testing routines and maintenance schedules. Products are matched to the water area and the guest profile: a slide complex for older children, splash play for families, a frame pool for supervised swimming and a challenge course for teenagers. 私たちの 鉄骨プール is often the first element, because it can be installed, tested and moved if the site changes.
Matching Products to the Site
The water area decides the product mix more than the budget does. Depth, footprint, access for maintenance and the position of the pump room all constrain what can be installed, so the first drawing should show the plant room, the circulation route and the lifeguard sight lines before any attraction is placed. Where the site has no water at all, an inflatable or frame based solution can open a water zone in weeks rather than seasons.
Water Treatment and Hygiene
Water quality is invisible until it fails. Design the circulation for a full turnover each day, include strainers and debris screens upstream of the pumps, plan dosing and testing routines with a written log, and train at least two staff to test and record. A park running several wet attractions should also have one trained water technician responsible for all of them, rather than relying on ride operators to handle chemicals.
Lifeguards, Rules and Maintenance
Supervision is the safety system in a water park. Set lifeguard stations so every blind spot is covered, define maximum guests per zone, enforce height and swimming rules at entry, and rehearse the evacuation procedure. Maintenance follows the same rhythm as the treatment plan, with daily checks of pumps, filters and drains, and monthly inspection of water treatment 装置, deck surfaces and handrails.
カスタマイズできるもの
ゲストが実際に気づく部分をカスタマイズ: Zone layout, product mix, テーマ, changing facilities and phasing.
私たちはアトラクションを再販するのではなく建設します, 技術的な質問がパンフレットではなく図面として返されるのはこのためです – そしてなぜ 125,000 平方メートル 生産拠点 納期を変更せずにカスタマイズを吸収できる. 給水システムは現場に合わせて設計されています, それで植物室, デッキと排水は同じ図面セットの一部です.
水域と深さを教えてください – アトラクションミックスをご提案します, 循環設計とそれに伴う運用ルール.










