Ordering two double deckers at once changes the economics: one design process, one shipping programme and one spare parts shelf covering both machines.
The operator installed a double decker carousel at each of two locations, using the same specification so that staffing and maintenance stay interchangeable.

主な仕様
| アイテム | 参照 |
|---|---|
| 国 | スペイン |
| プロジェクトの種類 | Double decker carousel project |
| Contract value | EUR 229,916 class project |
| Units | Two carousels ordered together |
| 範囲 | 供給, 配送と設置のサポート |
| 手術 | Two locations under one operator |
すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。. Running the same carousel model twice simplifies training, spares and inspection. See Carousel.

Why Two Units Made Sense
Running the same model at two sites simplifies everything: training, spares, inspection routines and even the lighting programme. Operators who plan to grow usually specify the first machine as the template for the second, which is exactly what happened here.
Installation Across Two Sites
Installation was sequenced so both platforms were prepared before the first shipment arrived, and the crews worked one site at a time. Because the assembly sequence is identical, the second installation ran faster – a common pattern when the same model is installed twice.
点灯, Theming and Site Fit
Both carousels were specified with LED lighting and music designed for evening trading, and each site chose its own colour theme while keeping the same structure. That combination gives the operator a recognisable brand without making the two locations identical.
メンテナンスとスペア
One spares kit covers both machines: lamps, restraint parts, figure fittings and drive components. The routine – daily restraint and platform checks, 毎週の駆動とブレーキの点検, monthly centre bearing review – is written once and applied at both sites, which is the advantage of standardising on a double decker carousel プラットフォーム.
デザインオプション
サイト固有の選択肢には次のものがあります。: 色, 数字, キャノピー, 照明と音楽.
私たちの 125,000 平方メートルの生産ベースカバーの製造, 成形, 一つ屋根の下での組み立てとテスト, そのため、容量を競合することなく、カスタム作業と標準の生産を並行して実行できます。. プロジェクト作業にはレイアウト図面が含まれます, 段階的な機器リストとドキュメントを地元の請負業者に直接渡すことができます.
サイトの詳細と作業の期限をお知らせください – フェーズをマッピングします, 設備とそれに対する費用の概要.










