The client wanted a water attraction but not a concrete project, so the pool was built from a bolted steel frame and a reinforced liner instead.

This delivery to the Philippines shows how a relocatable pool is assembled, filled and commissioned in a tropical setting.

steel frame pool structure

主な仕様

アイテム 参照
位置 Philippines
プロジェクトの種類 Steel frame pool for water play
構造 Bolted galvanised frame with PVC liner
インストール Modular assembly on a prepared base
給水システム Filtration and circulation per volume
手術 Seasonal with supervised sessions

すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。. Water quality management follows the same water treatment principles as any pool, with daily readings logged.

pool liner installation

Why a Steel Frame Pool Was Chosen

A permanent concrete pool means excavation, reinforcement, curing time and planning approval. A frame pool needs a level base, a bolted structure and a liner, and it can be extended or moved if the site changes. For an operator testing water play for the first time, that difference turned a construction project into a seasonal installation.

Assembly Sequence on Site

The frame is laid out and levelled first, then bolted into modules before the liner is fitted and the edges are secured. Getting the base truly flat is the step that decides everything else, because an uneven base loads the liner and the frame unevenly. 濾過, pump and dosing equipment were installed alongside the pool so commissioning could include a full circulation test.

Filling, Dosing and Water Quality

Once filled, the water was dosed to the target parameters and the circulation was run through a full turnover while readings were logged. Staff were trained to test and record daily rather than to guess, and the fence, depth marking and entry rules were agreed before guests arrived. Those three items – testing, fencing and rules – are what make a water attraction insurable and repeatable.

Operating Through the Wet Season

Tropical rain changes the operating routine: water level control, debris clearing and extra testing after heavy rain. The park keeps a drain plan and a shutdown rule for storms, and the liner is checked monthly for abrasion at the ladder and entry points. Operators adding a second water attraction later often follow the same sequence we set out for our 鉄骨プール 範囲.


カスタマイズできるもの

見た目を決めるのはあなたです, 私たちはエンジニアリング標準を維持します: プールのサイズ, 深さ, ライナーカラー, decking and filtration.

すべてのユニットが残す 125,000 テスト記録のある中国の㎡工場, 図面と推奨スペアリスト, それは何ですか 製造パートナー 単に請求書を請求するのではなく手渡す必要があります. 給水システムは現場に合わせて設計されています, それで植物室, デッキと排水は同じ図面セットの一部です.

区画と水の詳細を共有してください。段階的な水のレイアウトを返信します。: 最初に開くもの, 何が続くか, 各フェーズにかかる費用.