Almost every Indonesian enquiry begins with the same question, and the honest answer is that the number depends on five cost drivers – four of which are not the rides.

Here is how a park budget is actually built, and how to compare quotations so that the cheapest one does not become the most expensive project.

amusement ride shipping and crating

主な仕様

アイテム 参照
Cost drivers 装置, site works, 配送, インストール
Equipment share Usually the largest single line item
土木工事 基礎, 力, water and drainage
配送 Container volume plus port and inland charges
フェージング Split the investment across seasons
Quotation basis Separated by scope, never one lump sum

すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。.

ride parts loaded in container

What Decides the Total Cost

The equipment list is only the first line. Foundations and slabs, power supply and distribution, water and drainage, access roads and fencing, shipping and port charges, installation labour and crane hire, then spares and training all sit on top. A park quoted without those lines is not cheaper – the costs simply move to a contractor you have not appointed yet.

Why Phasing Changes the Number

Phasing affects cost in two directions. Splitting the project reduces the peak capital requirement and lets early revenue fund later phases, but it can add shipping and mobilisation cost on the second delivery. The rule that works in practice is to phase by zone – opening one complete area rather than half of three – so guests see a finished park from day one. 私たちの park project process guide sets out where phasing decisions belong.

How to Compare Quotations

Ask for each quotation to separate equipment, 配送, installation support and spare parts, and to state what the buyer arranges locally. Check whether load test documents, drawings, operator training and a spares list are included, and confirm the currency, cost estimate validity period and payment terms. Two quotes that look similar on the total often differ substantially in what the buyer must pay locally.

What to Do Next

Send a plot plan, a target opening date and an indicative budget range. With those three pieces of information a supplier can propose a ride mix that fits the money instead of quoting a wish list, and can phase it so that the park opens on time with a complete experience.


インストールのカスタマイズ

サイト固有の選択肢には次のものがあります。: Quotation scope, phasing and delivery terms.

同じ アミューズメント機器工場 乗り物を構築し、それを発送する, それを文書化してサポートします – 125,000 平方メートルの生産スペースと地元の検査官が使用できる文書パッケージ. プロジェクト作業にはレイアウト図面が含まれます, 段階的な機器リストとドキュメントを地元の請負業者に直接渡すことができます.

サイトの詳細と作業の期限をお知らせください – フェーズをマッピングします, 設備とそれに対する費用の概要.