Almost every Indonesian enquiry begins with the same question, and the honest answer is that the number depends on five cost drivers – four of which are not the rides.

Here is how a park budget is actually built, and how to compare quotations so that the cheapest one does not become the most expensive project.

amusement ride shipping and crating

Spécifications clés

Article Référence
Cost drivers Équipement, site works, expédition, installation
Equipment share Usually the largest single line item
Civil works Fondations, pouvoir, water and drainage
Expédition Container volume plus port and inland charges
Phaser Split the investment across seasons
Quotation basis Separated by scope, never one lump sum

Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

ride parts loaded in container

What Decides the Total Cost

The equipment list is only the first line. Foundations and slabs, power supply and distribution, water and drainage, access roads and fencing, shipping and port charges, installation labour and crane hire, then spares and training all sit on top. A park quoted without those lines is not cheaper – the costs simply move to a contractor you have not appointed yet.

Why Phasing Changes the Number

Phasing affects cost in two directions. Splitting the project reduces the peak capital requirement and lets early revenue fund later phases, but it can add shipping and mobilisation cost on the second delivery. The rule that works in practice is to phase by zone – opening one complete area rather than half of three – so guests see a finished park from day one. Notre park project process guide sets out where phasing decisions belong.

How to Compare Quotations

Ask for each quotation to separate equipment, expédition, installation support and spare parts, and to state what the buyer arranges locally. Check whether load test documents, drawings, operator training and a spares list are included, and confirm the currency, cost estimate validity period and payment terms. Two quotes that look similar on the total often differ substantially in what the buyer must pay locally.

What to Do Next

Send a plot plan, a target opening date and an indicative budget range. With those three pieces of information a supplier can propose a ride mix that fits the money instead of quoting a wish list, and can phase it so that the park opens on time with a complete experience.


Adaptation de l'installation

Les choix spécifiques au site incluent: Quotation scope, phasing and delivery terms.

Le même usine d'équipement de divertissement qui construit le trajet et l'expédie également, le documente et le soutient – 125,000 m² d'espace de production et un dossier de documentation que les inspecteurs locaux peuvent utiliser. Le travail du projet comprend des dessins d'implantation, des listes d'équipements et une documentation progressives que vous pouvez remettre directement à un entrepreneur local.

Donnez-nous les détails du chantier et la date limite à laquelle vous travaillez – nous cartographierons les phases, l'équipement et le coût indiqué par rapport à celui-ci.