Groups rarely build everything at once. This project was a second phase, adding a non-powered zone to a destination that already traded successfully.

Because the first phase was already operating, the new zone had to fit around existing walkways, power and ticket systems rather than start from a blank plot.

multi lane slide complex

Spécifications clés

Article Référence
Pays Malaysia
Type de projet Non-powered park phase two
Contract value USD 64,300 class project
Client type Leisure group operator
Portée Equipment supply with installation guidance
Focus Adding capacity to an existing attraction

Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site. Both parks build to established playground safety practice. Voir Playground.

climbing structure for park

Designing Around an Operating Site

The layout was planned against the existing entrance, queue lines and service routes so the new play zone could be built without closing the rest of the destination. Deliveries were scheduled outside peak hours, and the installation area was fenced small enough that guests barely noticed the work.

Choosing Equipment for Added Capacity

Phase two concentrated on capacity rather than novelty: a slide complex with multiple lanes, climbing structures and a large swing installation. That combination raises the number of children the site can hold at once without increasing staff in proportion, because the equipment is self directed.

Integration With the Existing Operation

Ticket and wristband systems already existed, so the new zone was simply added to the same entry model. Staff were trained on the additional inspection routine, and the surfacing plan was recorded alongside the original park drawings so future maintenance stays in one document.

What Phase Two Delivered

Adding the zone lengthened visits and lifted weekend revenue without new head office staff or new utilities. Operators planning a similar expansion usually start from the layouts we describe for non-powered parks and phase in the same order: anchor structure, then supporting play, then shade and service points.


Options de conception

La personnalisation couvre les pièces que les invités remarquent réellement: Mise en page, mix, colours and phasing.

Vingt ans de fabrication et d'exportation sont derrière ce produit, produit dans un 125,000 installation d'un mètre carré avec en interne conception, outillage et contrôle qualité. Les structures non motorisées sont livrées avec des données sur la hauteur de chute et des recommandations de revêtement pour chaque plate-forme et sortie de toboggan..

Envoyez votre plan de parcelle et vos préférences de revêtement – nous vous rendrons un tracé avec des hauteurs de chute, stratégie d'ombrage et liste d'équipement par étapes.