Water is the strongest seasonal product a tropical park can own, and it is also the one most often designed backwards – equipment first, plant room last.

This is how a turnkey water project is put together so that the water stays clean, the lifeguards can see everything and the park can open in phases.

water park splash zone

Spécifications clés

Article Référence
Portée Conception, équipement, aide à l'installation
Water products Complexe de diapositives, splash zone, piscine à cadre, parcours de défi
Besoins du site Water supply, drainage and a plant room
Traitement de l'eau Filtration, circulation and dosing
Opérations Lifeguards, session rules, testing log
Phaser Start with one water zone and expand

Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

frame pool water attraction

What a Turnkey Water Solution Includes

A complete solution covers the layout of the water zones, the equipment list with drawings, the water treatment and circulation design, installation support and the operating documents – rules, testing routines and maintenance schedules. Products are matched to the water area and the guest profile: a slide complex for older children, splash play for families, a frame pool for supervised swimming and a challenge course for teenagers. Notre piscine à ossature métallique is often the first element, because it can be installed, tested and moved if the site changes.

Matching Products to the Site

The water area decides the product mix more than the budget does. Depth, footprint, access for maintenance and the position of the pump room all constrain what can be installed, so the first drawing should show the plant room, the circulation route and the lifeguard sight lines before any attraction is placed. Where the site has no water at all, an inflatable or frame based solution can open a water zone in weeks rather than seasons.

Water Treatment and Hygiene

Water quality is invisible until it fails. Design the circulation for a full turnover each day, include strainers and debris screens upstream of the pumps, plan dosing and testing routines with a written log, and train at least two staff to test and record. A park running several wet attractions should also have one trained water technician responsible for all of them, rather than relying on ride operators to handle chemicals.

Lifeguards, Rules and Maintenance

Supervision is the safety system in a water park. Set lifeguard stations so every blind spot is covered, define maximum guests per zone, enforce height and swimming rules at entry, and rehearse the evacuation procedure. Maintenance follows the same rhythm as the treatment plan, with daily checks of pumps, filters and drains, and monthly inspection of traitement de l'eau équipement, deck surfaces and handrails.


Ce que vous pouvez personnaliser

La personnalisation couvre les pièces que les invités remarquent réellement: Disposition des zones, product mix, thématisation, changing facilities and phasing.

Nous construisons des attractions plutôt que de les revendre, c'est pourquoi les questions techniques reviennent sous forme de dessins plutôt que de brochures – et pourquoi un 125,000 m² base de production peut absorber la personnalisation sans déplacer votre date de livraison. Les systèmes d’eau sont conçus en fonction de votre site, donc le local technique, le platelage et le drainage font partie du même jeu de dessins.

Dites-nous la superficie de l'eau et la profondeur dont vous disposez – nous vous proposerons le mix d'attraction, la conception de la circulation et les règles de fonctionnement qui vont avec.