India is a market with thousands of small and mid-size parks, and projects there are won on reliability and after-sales rather than on price alone.
This order supplied a machinery package for an established operator, with the ride selection matched to existing attractions rather than duplicating what the park already ran.

Wichtige Spezifikationen
| Artikel | Referenz |
|---|---|
| Land | Indien |
| Projekttyp | Amusement park machinery package |
| Contract value | USD 285,895 class project |
| Client type | Amusement park operator |
| Umfang | Equipment supply with installation support |
| Unterstützung | Inbetriebnahme, training and spares planning |
Alle Angaben sind Richtwerte und werden im Planungsvorschlag für Ihren Standort bestätigt. Drive components such as electric motor units are standardised across the package to simplify spares. See Electric motor. Operators planning a similar project usually start from our Paket für Karnevalsfahrten.

Selecting Rides That Complement the Park
The starting point was what the park already operated. New attractions were chosen to fill gaps – capacity where queues were longest, a family ride where the mix was too thrill heavy, and a children ride for the youngest guests. Adding to a park is a different exercise from opening one.
Shipping and Documentation
Machinery travelled in containers loaded by assembly sequence, with packing lists matched to drawings and photographs taken before the doors closed. For a market where customs documentation is scrutinised, having the file complete before the vessel sails avoids the delays that cost Indian operators entire festival seasons.
Installation Without Closing the Park
Installation was planned around trading: work zones were fenced, deliveries scheduled outside peak hours, and commissioning arranged so the new rides could be tested without disturbing existing attractions. That planning is what allows a park to keep earning during an expansion.
Service and Spares in a Large Market
The operator received a recommended spares list and a service schedule per machine, because in a market with long internal transport routes, waiting for an imported part can close a ride for weeks. Consolidating spares with the original shipment is the cheapest way to avoid that.
Anpassung
Optionen, die Sie vor Produktionsbeginn festlegen können: Fahrtauswahl, layout, Thematisierung und Lieferphasen.
Our 125,000-square-metre production base covers fabrication, Formen, Montage und Prüfung unter einem Dach, So laufen Sonderanfertigungen und Standardproduktion nebeneinander, ohne dass sie um Kapazitäten konkurrieren. Die Projektarbeit umfasst Layoutzeichnungen, Gestaffelte Ausrüstungslisten und Dokumentationen, die Sie direkt an einen örtlichen Auftragnehmer weitergeben können.
Senden Sie Ihren Grundstücksplan, Budgetspanne und angestrebtes Eröffnungsdatum – Wir senden Ihnen einen schrittweisen Vorschlag zurück, den Sie direkt an Ihren Vorstand weiterleiten können.