Aire de jeux du château d’escalade
- Type de produit: Structure d'escalade thématique non motorisée
- Éléments: Tours, filets, diapositives, ponts
- Structure: Structure en acier avec revêtement thématique
- Sécurité: Parcours fermé avec revêtement d'impact
- Mise en page: Personnalisé au plan du parc
Dernier prix, Veuillez nous contacter!
A non-powered park needs one structure that guests can see from the gate and run toward, and a climbing castle does that job better than a row of separate play items.
For parks investing in a 1000 square metre non-powered zone, the castle becomes the anchor: everything else is arranged around it.

Spécifications clés
| Article | Référence |
|---|---|
| Type de produit | Structure d'escalade thématique non motorisée |
| Éléments | Tours, filets, diapositives, ponts |
| Structure | Structure en acier avec revêtement thématique |
| Sécurité | Parcours fermé avec revêtement d'impact |
| Mise en page | Personnalisé au plan du parc |
| Installation | Modulaire, phased build possible |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

Climbing Castle Playground Specifications
The structure combines several towers at different heights, connected by climbing nets, rope bridges and enclosed tunnels, with slides returning guests to ground level. Frames are steel with themed cladding in castle, forest or space styles, and the route is enclosed so children cannot leave the structure at height. Layout and tower count are designed around the site, and the build can be delivered in phases if the park is opening in stages.
Anchoring a Non-Powered Zone
A castle works as the centre of a layout: place seating and shade around it so parents stay close, and set the smaller attractions such as a slide complex or terrain de jeu de nuages rebondissants on the outer edges. This arrangement spreads crowds, keeps sight lines short and gives the park a single image for marketing.
Capacity and Age Zoning
Design the structure with a clearly separated younger children section and a taller, harder route for older children, because mixing them causes congestion and complaints. Post maximum user counts at each tower, éloigner la sortie de l'entrée, and check that supervising adults can stand close enough to help without blocking the flow of children inside.
Surfaçage, Fixings and Weather Protection
Fall height under the highest platform dictates the surfacing depth, so the design process must start before the ground works. Steel sections are protected to acier galvanisé specification and stainless fixings are used where moisture collects. The weekly inspection covers net tension, usure de la corde, joints coulissants, bolt torque and the depth of loose surfacing.
Options et thème
Tout ce qui est visible est à vous de définir: Thème, hauteurs de tour, configuration des diapositives, couleurs et signalétique.
Chaque unité laisse un 125,000 usine de m² en Chine avec dossiers de tests, dessins et liste de pièces de rechange recommandées, c'est quoi un partenaire de fabrication devrait remettre plutôt que simplement facturer. Les structures non motorisées sont livrées avec des données sur la hauteur de chute et des recommandations de revêtement pour chaque plate-forme et sortie de toboggan..
Partagez la disposition du site et nous produirons un plan de zone montrant les structures, surfaçage, drainage et la séquence pour les construire.
Contactez-nous!














