This was one of our larger non-powered projects in Southeast Asia, and the design brief was simple: keep families on site for three hours without a single motor.
The park combined a slide complex with climbing and swing structures, arranged so guests move through the site rather than queue at one attraction.

Spécifications clés
| Article | Référence |
|---|---|
| Pays | Malaysia |
| Type de projet | Non-powered family park |
| Contract value | USD 125,900 class project |
| Portée | Fourniture d'équipement, conseils d'expédition et d'installation |
| Mélanger | Complexe de diapositives, escalade, swing and family play |
| Soutien | Conception de la mise en page, surfacing notes and staff training |
Tous les chiffres sont des valeurs de référence et sont confirmés dans la proposition d'ingénierie de votre site.

Zoning a Large Play Area
The plot was divided into a main play zone, a toddler area and a shaded family zone with seating and service points. The slide complex sat where it is visible from the entrance, while older childrens climbing equipment was placed furthest from the toddler area to keep supervision simple and reduce collisions.
Equipment Selected for Tropical Use
Structures were specified for heat, humidité et fortes pluies: protected steel frames, UV stable finishes and netting that keeps its strength when wet. Impact surfacing was chosen to drain rather than hold water, and fall heights were recorded on the layout so the park can check depths on a schedule.
Installation and Handover
The equipment shipped in phases so the park could open its main zone first and complete the secondary areas afterwards. Installation ran under factory supervision with local labour, followed by commissioning checks and staff training on daily inspection, supervision positions and capacity control.
Running a Non-Powered Park Profitably
Without machines, the operating cost is staffing, cleaning and surfacing maintenance – which is why the park carries a small team and keeps entry pricing simple. The same logic is described in our guide to a non powered amusement park, and the safety approach follows recognised playground practice such as DANS 1176.
Conçu pour s'adapter à votre parc
Tout ce qui est visible est à vous de définir: Disposition des zones, mélange d'équipements, revêtement et ombre.
Chaque unité laisse un 125,000 Usine de m² en Chine avec dossiers de tests, dessins et liste de pièces de rechange recommandées, c'est quoi un partenaire de fabrication devrait remettre plutôt que simplement facturer. Les structures non motorisées sont livrées avec des données sur la hauteur de chute et des recommandations de revêtement pour chaque plate-forme et sortie de toboggan..
Partagez la disposition du site et nous produirons un plan de zone montrant les structures, surfaçage, drainage et la séquence pour les construire.