A promenade carousel trades when the sun goes down and the boardwalk fills up, and it has to survive salt air the rest of the year.
This project shows how a standard carousel changes when the site is a windy promenade rather than a sheltered park.

主な仕様
| アイテム | 参照 |
|---|---|
| 位置 | Seaside promenade |
| プロジェクトの種類 | Two storey carousel for a promenade |
| Exposure | Salt air, wind and humidity |
| 仕様 | Corrosion protection and sealed electricals |
| Trading | Afternoon and evening footfall |
| サポート | 試運転, training and spares |
すべての数値は参考値であり、お客様のサイトのエンジニアリング提案で確認されます。. Salt air accelerates 腐食 コーティングされていないものの上に, which is why the specification changes at the coast.

Specifying Against Salt and Wind
Coastal installations need hot dip galvanised or stainless fixings, sealed connectors and additional coating on exposed steel. Wind exposure also affects the operating rules: an anemometer on site, a written wind limit and a shutdown procedure protect both guests and the machine. Those three items cost very little and prevent the most expensive damage a seaside park can suffer.
Installation on a Working Promenade
Promenade projects run against tight site hours, so the installation was planned in stages around trading and public access. The platform went in first, then the frame and drive, then the upper structure and finishing. Deliveries were scheduled outside peak public hours, and the fenced site was kept small enough that the promenade stayed open.
Evening Trade and Ticket Design
Evening is the commercial peak. Lighting and music were programmed as a show, and the ticket offer was kept simple so families could decide on the spot. The park also trained staff to manage the queue in two waves: the post dinner rush and the later teenage crowd, which behave very differently and need different supervision levels.
The Weekly Routine That Keeps It Running
Salt air makes some jobs weekly rather than monthly. The routine covers rinsing and inspecting fasteners, checking the drive and brake, testing restraint locks and washing figure surfaces. A coastal park using our ピンクの白鳥メリーゴーランド or any similar platform applies the same additional corrosion checks, and the difference shows after two or three seasons.
カスタマイズ
あなたのブランドに合わせてください: 色, 数字, 照明とプラットフォームの仕上げ.
直接引用します 機器メーカー からの 125,000 m²生産拠点, 技術的な会話と商業的な会話が同じ場所で行われる, と 20 答えの裏には長年にわたる輸出プロジェクトがあった. プロジェクト作業にはレイアウト図面が含まれます, 段階的な機器リストとドキュメントを地元の請負業者に直接渡すことができます.
プロットプランを送信してください, 予算範囲と目標開業日 – 段階的な提案を返信しますので、取締役会に直接提出してください。.










