The client needed to move guests across a large site and turn that movement into an attraction at the same time – which is exactly what a trackless train does.
The train runs a fixed loop with stations at the entrance, mid-park and the far end, so it reduces walking distance instead of simply touring the site.

Especificaciones clave
| Artículo | Referencia |
|---|---|
| País | Vietnam |
| Tipo de proyecto | Trackless ride train |
| Contract value | Dólar estadounidense 23,100 class project |
| Alcance | Suministrar, guía de envío e instalación |
| Ruta | Circuito pavimentado con estaciones de embarque |
| Fuerza | Diésel o eléctrico por sitio |
Todas las cifras son valores de referencia y están confirmados en la propuesta de ingeniería para su sitio.. Diesel and electric versions suit different routes, dependiendo de las características del motor y el ciclo de trabajo. Ver Diesel engine.

Route and Station Planning
The route was planned like a transport line: wide enough for carriages to pass safely, avoiding gradients beyond the train’s capability, y con puntos de embarque donde los huéspedes llegan naturalmente. Station platforms were kept clear of the main walkway so boarding never blocks circulation during peak hours.
Configuration and Capacity
Carriage count followed the peak flow between stations, and the train length was checked against the tightest corner on the route. Las versiones diésel y eléctrica se adaptan a diferentes sitios: electric for enclosed or quiet zones, diesel for long outdoor loops. Nuestro trackless tourist train range covers the common configurations used on projects like this.
Capacitación de conductores y seguridad de los huéspedes
Drivers were trained on the actual route: límites de velocidad en las curvas, stopping positions at each station, boarding rules and the correct response if a guest stands up. Station attendants control boarding during peaks, and written rules are posted at each stop.
Servicing a Vehicle That Works Daily
The train runs every day, so maintenance is scheduled: daily brake, tyre, light and coupling checks, weekly drive and steering inspection, and monthly chassis review. Keeping spare wheels, brake parts and lamps on site keeps the train in service rather than parked as an attraction that no longer runs.
Adaptación de la instalación
Las opciones específicas del sitio incluyen: Ruta, diseño de carro, capacidad, tipo de potencia y librea.
El fabricante aquí está la fábrica misma: diseño, acería, moldura, El montaje y las pruebas se realizan dentro de un 125,000 base de producción de metros cuadrados, Y cada unidad se ejecuta bajo carga antes de empacarla.. El trabajo del proyecto incluye dibujos de diseño., Listas de equipos por fases y documentación que puede entregar directamente a un contratista local..
Danos los detalles del sitio y la fecha límite para la que estás trabajando. – mapearemos las fases, El equipo y el esquema de costos..