The client needed to move guests across a large site and turn that movement into an attraction at the same time – which is exactly what a trackless train does.

The train runs a fixed loop with stations at the entrance, mid-park and the far end, so it reduces walking distance instead of simply touring the site.

train route through park

주요 사양

목 참조
국가 Vietnam
프로젝트 유형 Trackless ride train
Contract value USD 23,100 class project
범위 공급, 배송 및 설치 안내
노선 탑승역이 있는 포장 루프
힘 사이트당 디젤 또는 전기

모든 수치는 참조 값이며 귀하의 현장에 대한 엔지니어링 제안에서 확인되었습니다.. Diesel and electric versions suit different routes, 엔진 특성 및 듀티 사이클에 따라 다름. 보다 Diesel engine.

guests boarding trackless train

Route and Station Planning

The route was planned like a transport line: wide enough for carriages to pass safely, avoiding gradients beyond the train’s capability, 손님이 자연스럽게 도착하는 탑승 지점으로. Station platforms were kept clear of the main walkway so boarding never blocks circulation during peak hours.

Configuration and Capacity

Carriage count followed the peak flow between stations, and the train length was checked against the tightest corner on the route. 디젤 및 전기 버전은 다양한 현장에 적합합니다.: electric for enclosed or quiet zones, diesel for long outdoor loops. 우리의 trackless tourist train range covers the common configurations used on projects like this.

운전자 교육 및 고객 안전

Drivers were trained on the actual route: 코너 속도 제한, stopping positions at each station, boarding rules and the correct response if a guest stands up. Station attendants control boarding during peaks, and written rules are posted at each stop.

Servicing a Vehicle That Works Daily

The train runs every day, so maintenance is scheduled: daily brake, tyre, light and coupling checks, weekly drive and steering inspection, and monthly chassis review. Keeping spare wheels, brake parts and lamps on site keeps the train in service rather than parked as an attraction that no longer runs.


설치 조정

사이트별 선택에는 다음이 포함됩니다.: 노선, 캐리지 디자인, 용량, 파워 타입과 리버리.

그만큼 제조업체 여기 공장 자체가 있어요: 설계, 가얼 구조, 조형, 조립과 테스트는 모두 내부에서 이루어집니다. 125,000 평방미터 생산기지, 모든 장치는 포장되기 전에 부하가 걸린 상태에서 실행됩니다.. 프로젝트 작업에는 레이아웃 도면이 포함됩니다., 현지 계약자에게 직접 전달할 수 있는 단계별 장비 목록 및 문서.

작업 중인 사이트 세부 정보와 마감일을 알려주십시오. – 우리는 단계를 매핑할 것입니다, 장비 및 이에 대한 비용 개요.