Pairing soft play with an arcade answers two questions in an indoor venue: what older children do, and what guests do while they wait.
This project built a 350 square metre play centre with a compact arcade row, designed so the two areas support each other.

المواصفات الرئيسية
| غرض | مرجع |
|---|---|
| دولة | Uzbekistan |
| نوع المشروع | Soft play with arcade zone |
| مساحة الأرضية | 350 sq m class project |
| مزج | هيكل اللعب, toddler area, arcade machines |
| نِطَاق | تصميم, equipment and installation support |
| عملية | Entry tickets, arcade credit and parties |
جميع الأرقام هي قيم مرجعية وتم تأكيدها في الاقتراح الهندسي لموقعك. Ball pools need scheduled cleaning rather than occasional attention. يرى Ball pit.

Layout and Circulation
The play structure sits at the back of the unit so the arcade can run along the entrance side and capture guests on the way in and out. Reception sits between the two with a single payment point for entry tickets and arcade credit, which keeps staffing simple.
Machine Selection
The arcade mix concentrated on machines that suit family spend rather than a teenage audience: prize machines, a racing simulator and a few kiddie units. That mix runs on the same hours as the play centre and does not compete with it for space.
Safety and Cleaning
Soft play elements follow established playground safety practice with fall heights recorded on the layout, and the venue checks netting, padding and fixings daily. The arcade adds its own routine: cabinet cleaning, payment system checks and light maintenance per machine type.
Operating Model
Entry tickets cover play, arcade credit covers games, and party packages bundle both – three income lines from one visitor. This is the model we describe in our indoor FEC package مرشد.
ما يمكنك خياطه
عليك أن تقرر المظهر, نحن نحافظ على المعايير الهندسية: تخطيط المنطقة, arcade mix, theme and ticketing.
نحن نقتبس كما المباشر الشركة المصنعة للمعدات من قاعدة إنتاج تبلغ مساحتها 125,000 متر مربع, لذا فإن المحادثة الفنية والتجارية تحدث في نفس المكان, مع 20 سنوات من مشاريع التصدير وراء الجواب. يتم شحن التركيبات الداخلية مع فحوصات تحميل الأرضية والسقف, لأن هذين الرقمين يقرران ما يمكن تثبيته.
قم بمشاركة أبعاد الوحدة والقدرة المستهدفة وسننتج مخططًا يوضح المناطق, نقاط التداول وإصدار التذاكر.










